Air Conditioning cutoff from Oct. 15 till Oct. 31st

As you may be aware, this fall we begin the replacement of all the fan-coil units (FCU) throughout the building.

These units provide you air-conditioning in the warm months and heating in the cool months. The FCU’s are being replaced with more modern and more efficient technology which will provide us all with energy cost savings and more comfort for you.

In order to prepare for this new system replacement, we need to replace the main pumps that have been working for decades with newer, more efficient pumps. These are the pumps that circulate the water through the FCU’s.
This process is estimated to take approximately 2 weeks, starting October 15th and ending October 31st. Once replaced, we will perform our annual switch-over from cooling to heating.

As the weather is unpredictable most of the time, we ask for your patience while the transition happens. Hopefully, the weather will be cooperative and not cause extreme variances in temperature that would cause us discomfort.